About rolling benches


Stål & Plast A/S produces a large amount of various ebb/flow trays for rolling benches.

The rolling bench trays are delivered i a large amount of different widths, see the tray program. The tray length is normally not recommended to exceed 20 meters put together. If longer benches are the case, it is recommended to split up the ebb/flow trays in to 2 or more pieces, so the length on one single together-glued unit does not exceed 20 meter.




Tray program


NOTE: The dimensions in the chart are GUIDELINES! Correct dimensions are found on the individual drawings.

Dimensions marked bold letters, are standard stock items.

Click on the individual lengths to see the drawings.

Type
Width (mm)
Length (mm)
330.3 330 1000 - 2000
435.4 435 1980
630.4 630 1000 - 2000
800.5 800 2000
1000.6 1000 1000 - 2000
1200.7 1200 2000
1450.5 1435 - 1455 - 1475 2000 - 2270 - 2320
1500.9 1500 - 1520 - 1540 - 1560 2000 - 2260 - 2510
1620.9 1600 - 1620 - 1640 - 1660 2000 - 2100 - 2270 - 2320 - 2370
1700.9 1680 - 1700 2000 - 2260
1800.10 1780 - 1800 - 1820 1500
1900.11 1880 - 1900 - 1920 1500
2000.11 1980 - 2000 - 2020 1500
2200.12 2200 1500
1600.10-AIR 1600 - 1620 - more about... 1000




Trays with large channels for PEL hose
1220.5 1210 - 1240 1000
1520.7 1500 - 1520 1000
1620.7 1600 - 1620 1000
1820.8 1800 - 1820 1000
2020.9 2000 - 2020 1000


The following trays are available in 4-sided:

Type
Width (mm)

Length (mm)
330.3 330 1100 - 2040
435.4 435 2015
630.4 630 1100 - 2040
800.5 800 2040
1000.6 1000 1100 - 2040
1200.7 1200 2040
1220.5 1210 1050
1820.8 1820 1040
1200.16 1200 2500
1500.9 1500 3000
1600.9 1600 3000
1600.9 1600 3500
EUR-plade 1200 - more about... 800
CC 555 - more about... 630 - 1260

Installment manual for rolling benches


Conditions
.

Glue-work may only be done when:

  1. Temperature is between 5-25° C.
  2. The weather is dry and the trays are dry.

 

Sub support of the bench trays.

By a max. load of 70 kg/m2 evenly distributed, the following demands to sub support must be met:

  1. The bench trays must generally be supported with max. 500 mm. space.
  2. A support is placed max. 70 mm. from the glue rim. IMPORTANT: This MUST be under the tray part WITH glue lip, see as an example the drawing below.
  3. A support is placed max. 200 mm. from the edge of the bent tray. Notice the sump (A), which can NOT rest on the sub support.



Installment

The bench trays are placed in the bench frames and distributed so a glue joint appears (B) of between 5 - 8 mm.



Due to variations in temperature the bench tops will “work” lengthwise. Therefore it is necessary to ensure there is some air (C) between the edge of the plate and the edge of the table. The volume of air depends primarily on the bench length, but geographic location and maintenance by the user are also significant. As a rule of thumb, the following calculations may be used:

2a. For installations in cooler regions of the world, e.g. Scandinavia, at 20° Celcius* there should be at least 2 mm of air per linear meter bench top (distributed between both ends). This can be expressed in the following formula: Air = bench length x 0.002.

2b. For installations in warmer regions of the world, e.g. southern Europe, at 20° Celcius* there should be at least 3 mm of air per linear meter bench top (distributed between both ends). This can be expressed in the following formula: Air = bench length x 0.003.

* For every 10° Celcius, the air is changed with 1 mm per linear meter bench top.

The user is advised to place a high priority on maintenance.Never allow empty benches to stand in direct sunlight - and certainly not on warm days since the sun can quickly heat the plastic material up to 60°C.If bench tops are empty, it is recommended that they be protected, e.g. by stacking the benches, shading them, filling with water, etc.




Glue

  1. When the bench trays are correctly placed in the bench frames, the glue is pressed into the grove (NOT between the overlapping of the trays), and any extra glue is scraped off with a steel putty knife.
  2. Always use as little glue as possible. Excessive use will damage the trays which are NOT covered by warranty. As principal rule the use of glue must not exceed 1 litre of glue per 20 meter glue joint (1 tube per 6 meter glue joint).
  3. The glue must dry for at least 24 hours at 20° Celsius. If the temperature is bellow 20° Celsius, the dry time must expected increasing. It`s important that the temperature is kept constant during drying.

Use breath protection and gloves during the time of working with the glue, as the glue contains an organic solvent.

 
Stål & Plast A/S | Industrivej 19 DK-5750 Ringe • Tel: +45 6262 1216 • Fax: +45 6262 3611
Brug af cookies
Hjemmesiden bruger cookies.

Cookies er nødvendige for at få hjemmesiden til at fungere og hjælper os med at levere vores tjenester. De oplyser hvordan du bruger vores hjemmeside og hjælper os med at forbedre din og andres oplevelse af hjemmesiden.

Klikker du videre på hjemmesiden, accepterer du vores brug af cookies.

Ønsker du at slette cookies kan der findes vejledninger på Google, se mere her.

OK, forstået!